EPS bucket arch construction process

Your current location: home page >> News >> Industry News

EPS bucket arch construction process

Date of issue: 2023-01-19 Author: Click:

1. Site investigation


Investigate the construction site and check the foundation surface. The foundation surface is required to be flat, dense and free of pollution. The unqualified base surface needs to be coordinated with the relevant parties to renovate the base surface and recheck for confirmation.


2. Stay wire


Relevant dimensions shall be measured on site.


3. Drawing confirmation


According to the actual situation of the site and in combination with the design drawings, confirm the size and shape of the product, put forward modification suggestions in time and send them to the owner and designer for confirmation.


4. Product manufacturing


   Baotou EPS Dougong products are produced in factory. The factory shall convert engineering drawings into processing drawings, arrange detailed product processing procedures and production plans, and closely arrange the production schedule according to the actual needs of the site. Timely respond to the on-site feedback and adjust it according to the situation.


 Baotou EPS


5. Snap the line


To be installed according to construction drawings EPS The positioning line (center line or side line) pops up at the bucket arch.


6. Line cutting


The products produced by the factory are very long. When installing on site, try to use the whole line, and cut the lines to be cut with a saw. The cutting surface shall be as flat and uneven as possible, and shall be polished with sandpaper.


7. Prepare mortar on site.


① The construction mortar is the construction mortar EPS special polymer bonding mortar base surface requirements;


② The hand-held electric mixer shall be used for mixing during construction. The mixing shall be sufficient, uniform and of moderate consistency.


③ After the mortar is prepared, it needs to stand for 5min. Before use, it needs to be mixed again. The mixed mortar should be used up within 2 hours.


8. Paste line


Polystyrene EPS bucket arch adhesive adopts two composite bonding mortars, the small line adopts the full bonding method, and the large line adopts the point circle bonding method. Squeeze the EPS bucket arch forcefully to make the wall completely fit, the fullness is not less than 80%, and the width of the bonding joint is not less than 3MM. The bonding joint shall match with the bonding hook, the mortar joint shall be full, and the bonding joint shall be full, and the EPS component surface shall be clean.


*Disclaimer: The reprinted content is from the network. If you have any objection, please contact us in time, and the network will delete it.

Related labels: Baotou EPS , Inner Mongolia EPS , Hohhot EPS

Browsing records:

Online Service
share
Welcome to leave us a message