Construction technology of Baotou EPS bucket arch

Your current location: home page >> News >> Company News

Construction technology of Baotou EPS bucket arch

Date of issue: 2023-07-11 Author: Click:

1. Site investigation


Yes Baotou EPS The construction site shall be surveyed to check the condition of the foundation surface, which shall be flat, compact and free from pollution. For the unqualified foundation surface, it shall coordinate with the relevant parties, reconstruct the foundation surface, and recheck to determine.


2. Stay wire


Relevant dimensions shall be measured on site.


3. Drawing determination


According to the specific situation of the site and in combination with the design drawings, check the size and shape of the product, put forward modification suggestions in time, and send them to the owner and designer for confirmation.


 Baotou EPS


4. Production


Eps dougong products are produced on a large scale. The factory shall convert the construction drawing into the processing drawing, arrange the detailed product processing sequence and production plan, and closely arrange the production schedule according to the actual needs of the site. Timely take action and adjust the on-site feedback according to the situation.


5. Snap a line


According to the engineering drawing, snap the positioning line (centerline or sideline) at the position where the eps bucket arch is to be installed.


6. Line clipping


The products produced by the factory are very long. When installing on site, try to use the whole line, and use a saw to cut the line to be cut. The cutting surface shall be flat and uneven as far as possible, and shall be polished with sandpaper.


7. Prepare mortar on site.


① The mortar used in the construction is a polymer plaster mortar specially made for the requirements of eps base surface;


② The hand-held electric mixer shall be used for mixing during construction, and the mixing shall be sufficient, uniform and of moderate consistency.


③ After the mortar is ready, it needs to stand for 5 minutes before use. The mixed mortar should be used up within 2 hours.


8. Paste Line


Polystyrene eps bucket arch adhesive adopts excellent composite plastering mortar, small lines are pasted by full adhesion method, large lines are pasted by dot and circle adhesion method, and eps bucket arch is forced to fit the wall completely, with fullness not less than 80%, and the width of bonding joint not more than 3mm. The adhesive joint shall be bonded together with the adhesive hook, the brick joint shall be full, and the eps component surface shall be kept clean.


*Disclaimer: The reprinted content is from the network. If you have any objection, please contact us in time, and the network will delete it.


Related labels: Baotou EPS , Inner Mongolia EPS , Hohhot EPS

Browsing records:

Online Service
share
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address