Baotou EPC

contact us

Inner Mongolia Shiran Building Decoration Materials


Contact: Mr. Shi

Tel: 13394720666

Telephone: thirteen billion eight hundred and forty-eight million two hundred and twenty-six thousand six hundred and sixty

Website: c8u9.cn

Address: No. 8, Building 3, Minsheng Fourth Village, Haye Hutong Town, Jiuyuan District, Baotou City


Precautions for installing eps lines

Your current location: home page >> News >> Industry News

Precautions for installing eps lines

Date of issue: 2021-03-29 Author: Click:

The new decorative lines can prevent fire without emitting toxic substances, and are environmentally friendly decorative building materials. Eps component is widely used. In terms of this material, let's learn about the precautions for installing EPS lines.


First of all, the site survey shall be carried out before installation, and the installation faces shall be flat and compact. If the faces do not meet the installation requirements, they shall be adjusted until the faces meet the installation requirements.


The second is the field measurement, which is mainly based on the size of the site and eps lines to make a scale and mark, so as to reduce errors during construction. At the same time, it is also necessary to draw corresponding drawings, which can be put into use after being confirmed by many parties.


Later, when purchasing EPS lines, it is better to purchase them with a calculated suitable size. If problems are encountered during installation, it is better to adjust them in time to avoid affecting the subsequent construction. When installing on site, try to use the whole line. If some EPS lines need to be cut, it is better to use sandpaper to polish both ends.


 Baotou EPS


   Baotou EPS When calculating the quantities, the line decoration lines are generally divided into two categories: sill lines, door and window sleeves, eaves lines, waist lines, and other lines with the spread width less than 200 mm are calculated in linear meters according to the actual installation quantity.


If the spread width exceeds 200mm, there are two cases: normally, the spread area outside the bonding surface is calculated according to the size shown in the figure. Or the wall structure needs EPS The line shall be filled. When the hidden surface (including bonding surface) of EPS filling material exceeds 1/2 of the peripheral developed area, it shall be calculated as 3/4 of the peripheral developed area of the line.


   Roman Column For cap, baluster cap, arc, pattern splicing, wrapped corner, wrapped column and other special-shaped components, due to their various shapes, high technical requirements and difficult installation, their quantities are generally calculated by multiplying the developed area of the product's decorative outer surface by the coefficient 2.2.


Disclaimer: The reprinted content is from the network. If you have any objection, please contact us in time, and the network will delete it


Related labels: Baotou EPS

Browsing records:

Online Service
share
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address