Baotou EPC

contact us

Inner Mongolia Shiran Building Decoration Materials


Contact: Mr. Shi

Tel: 13394720666

Telephone: thirteen billion eight hundred and forty-eight million two hundred and twenty-six thousand six hundred and sixty

Website: c8u9.cn

Address: No. 8, Building 3, Minsheng Fourth Village, Haye Hutong Town, Jiuyuan District, Baotou City


Pay attention to the use and maintenance of EPS components to prevent leakage

Your current location: home page >> News >> Industry News

Pay attention to the use and maintenance of EPS components to prevent leakage

Date of issue: 2023-12-11 Author: Click:

   Baotou EPS Improper use or maintenance of components may also lead to leakage of external insulation wall, mainly in the following aspects:


(1) When the user installs the air conditioner on the external insulation air conditioning board, the holes for fixing the air conditioner are not sealed and damp proof. Some holes are dug randomly on the wall to adjust holes, which will damage the protective surface layer and lead to wall leakage.


(2) The waterproof layer of eaves gutter and terrace is damaged, resulting in wall leakage.


(3) The downspout is blocked and not removed in time, and the drainage is not smooth, resulting in water storage and leakage of the outer protective layer.


(4) The anti-theft window is installed on the window, which damages the surface and causes water seepage.


 Baotou EPS


(5) The external thermal insulation system of the external wall at the bottom of the building is often subject to abnormal collision by some external forces, resulting in that the holes cannot be repaired in time. The above is one of the factors leading to leakage of external insulation wall. In order to solve the above problems, the use and maintenance table of external insulation shall be attached to the building when it is delivered for use, and the damaged position shall be repaired in time.


   EPS The leakage of the external insulation wall of the component not only affects the use of the building, but also is not conducive to the durability of the external insulation, so we should pay attention to it. On the premise of ensuring the quality of materials, a detailed construction plan should be formulated before construction, and construction should be carried out in strict accordance with the construction technology. After completion and use, external insulation should be carried out to completely avoid leakage of the external insulation wall.


*Disclaimer: The reprinted content is from the network. If you have any objection, please contact us in time, and the network will delete it.


Related labels: Baotou EPS , Inner Mongolia EPS , Hohhot EPS

Browsing records:

Online Service
share
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address